Part P Explained in Plain English: A Homeowner's Guide

Practical advice from Sparcford in Kingston

Part P is the part of the Building Regulations that covers electrical safety in homes in England. Here is the short answer to what it means for you.

Only three types of electrical job are notifiable: installing a new circuit, replacing a consumer unit (the modern fuse box), and adding to or altering circuits in a “special location”, which mainly means the area around a bath or shower. Everything else, such as replacing a socket or light fitting, or adding a socket to an existing circuit in a bedroom, does not need to be notified. All electrical work, notifiable or not, must still be done safely and to BS 7671. If notifiable work is not being done by an electrician registered with a competent person scheme, building control must be told before the work starts.

The rest of this guide explains each of those points, and how notifying building control works if you live in Kingston upon Thames or Richmond upon Thames.

What Part P actually says

Part P has a single requirement, known as P1. It says that “reasonable provision shall be made in the design and installation of electrical installations in order to protect persons operating, maintaining or altering the installations from fire or injury.”

The government’s guidance on how to meet it is Approved Document P. The current edition is the 2013 edition, for use in England. It says that all electrical installation work carried out in a dwelling is subject to requirement P1, and that electrical installations should be designed and installed in accordance with BS 7671, the IET Wiring Regulations.

Part P does not stop at your front door. It also covers:

  • parts of the installation outside the house, such as fixed lighting and air conditioning units on outside walls, solar panels on the roof, and fixed lighting and pond pumps in the garden
  • outbuildings such as sheds, detached garages and domestic greenhouses
  • conservatories, porches, garages and sheds that share their electricity supply with the house

What counts as notifiable work

The list of notifiable electrical work is set out in regulation 12(6A) of the Building Regulations 2010. Notifiable work is:

  1. Installing a new circuit.
  2. Replacing a consumer unit.
  3. Any addition or alteration to existing circuits in a special location.

A special location is defined in two ways:

  • In a room containing a bath or shower: the space around the bath tap or shower head, from the floor up to 2.25 metres (or up to the shower head, if it is fixed higher than that), and out to 0.6 metres from the edge of the bath tub or shower tray. Where there is no tub or tray, the space extends 1.2 metres from the centre of the shower head.
  • A room containing a swimming pool or sauna heater.

Approved Document P gives two examples that show where the line falls. Installing a built-in cooker is not notifiable, unless a new cooker circuit is needed. Connecting an electric gate or garage door to an existing isolator switch is not notifiable, but running a new circuit from the consumer unit to that isolator is.

JobNotifiable?
Replacing a socket, switch or light fittingNo
Repairs and maintenanceNo
Adding a socket or light to an existing circuit, outside a special locationNo
Adding to or altering a circuit within the bath or shower zoneYes
Installing a new circuitYes
Replacing a consumer unitYes

If you are not sure which side of the line a job falls, GOV.UK advises you to check with a building control body.

What you can do yourself

Part P does not ban DIY electrical work. Approved Document P says that everything outside regulation 12(6A) is not notifiable: “additions and alterations to existing installations outside special locations, and replacements, repairs and maintenance anywhere.” GOV.UK’s list of work that does not need approval includes “new power and lighting points, or changes to existing circuits (except around baths and showers)”.

Not notifiable does not mean unregulated, though. GOV.UK says “you must meet safety and energy efficiency standards even if you do not need formal approval.” Approved Document P goes further:

  • Non-notifiable work should be designed, installed, inspected, tested and certificated to BS 7671, just like notifiable work.
  • When you add to an existing installation, the existing installation should be checked to make sure the equipment can carry the extra load, that adequate protective measures are in place, and that the earthing and bonding are satisfactory.
  • If a council finds that non-notifiable work is unsafe and non-compliant, it can take enforcement action.

So the honest answer is that you are allowed to do non-notifiable work yourself, but you are responsible for it being safe and compliant. If you cannot inspect and test the work to BS 7671, have it checked by someone who can. Our guide to adding a socket covers one of the most common examples in more detail.

The three ways notifiable work can be certified

Approved Document P sets out three routes. One of them must be used for every notifiable job.

1. A registered competent person

Electricians registered with a government-authorised competent person scheme can self-certify their own work. GOV.UK says “you do not need to get approval yourself if you use someone registered with a competent person scheme.”

Under Approved Document P, a registered electrician should give you a BS 7671 electrical installation certificate for every job. Within 30 days of the work being completed, the electrician or their scheme must give you a Building Regulations compliance certificate and tell building control about the work.

GOV.UK points homeowners to the Electrical Competent Person Register to find a registered electrician. Our guide on how to choose a qualified electrician covers what else to check.

2. A registered third-party certifier

An installer who is not registered can appoint a registered third-party certifier to inspect and test the work. This must be arranged before work begins. The installer must notify the certifier within 5 days of finishing. If the inspection and testing are satisfactory, the certifier issues an electrical installation condition report, and their registration body must send you a Building Regulations compliance certificate within 30 days and tell building control.

3. Building control

If neither of the first two routes is used, the installer must notify a building control body before work begins. GOV.UK explains that this can be your local council or a registered building control approver. This guide covers the council route.

Building control then decides how much inspection and testing it needs to do to be sure the work is safe, based on the nature of the work and the competence of the installer. It may carry out the testing itself or bring in a specialist. If the installer is competent to inspect and test, they should give their BS 7671 certificate to building control, which may ask for evidence of their qualifications. Approved Document P notes this can result in a lower charge.

Once building control is satisfied, the council issues a Building Regulations completion certificate.

There are two ways to apply: a full plans application, or a building notice for smaller projects. With a building notice, you can start work 2 days after the notice has been submitted.

Notifying building control in Kingston upon Thames

The Royal Borough of Kingston’s building control service handles notifications for homes in the borough. Its building notice page says:

  • A building notice is for small domestic projects only.
  • If your tradesperson belongs to a recognised competent person scheme, you will not need to apply for a building notice.
  • You should apply online at least 48 hours before starting work. A downloadable form is also available, but the council says this can take longer.
  • The council will email you within 5 working days to acknowledge the application.
  • You must let the council know when the work starts and book a site inspection. Kingston says a completion certificate will be issued within 5 working days of a satisfactory inspection.

The charge: Kingston’s standard domestic charges list electrical installations of up to 12 circuits, carried out outside a competent person scheme, at £695 for either a building notice or a full plans application. The council states that the building notice fee includes VAT. These are the figures at the time of writing, so check the council’s page before you apply.

Kingston’s page on when you need building control approval is clear about the alternative: “It’s illegal not to tell us about your building work. You might have to correct the work or pay a fine if you do not tell us about it.”

You can contact the team at building.control@kingston.gov.uk.

Notifying building control in Richmond upon Thames

Richmond Council’s building control team accepts building regulations applications online through the Building Control application service on the Planning Portal, or on a downloadable form. A building notice costs exactly the same as a full plans application, and for a building notice the full fee is paid with the application.

Richmond’s electrical works page explains the two options for notifiable electrical work: use a member of a competent person scheme, or deposit a building regulations application (full plans or building notice). Where a scheme member is not used, the council says:

  • the installation should be inspected by a competent person before the wiring and cables are covered, and again on completion
  • a BS 7671 electrical installation certificate must be given to you and to the council’s surveyor
  • the council cannot issue a completion certificate for the work until it has that certificate

Under the building notice route, Richmond says the onus is on the applicant to notify building control and request inspections. A completion certificate follows a satisfactory final inspection.

The charge: Richmond’s 2026 charges, effective from 1 April 2026, list electrical wiring of up to 12 circuits, where the electrician is not in a competent person scheme, at £601 including VAT for a building notice. A full plans application totals the same, split between a plan charge and an inspection charge.

Richmond’s pages do not give a specific notice period, so follow the national rule: notify before work begins, and with a building notice, allow at least 2 days before starting.

You can contact the team at buildingcontrol@richmond.gov.uk or on 020 8891 7117.

What if work has already been done without notification?

If notifiable work was carried out without telling building control, the council may be able to issue a regularisation certificate. GOV.UK says this is retrospective approval, available from local authorities only, and only for work carried out after 11 November 1985. You may need to make alterations before the council agrees the work complies.

Both councils say they may need to open up the work to inspect it. Kingston’s regularisation page notes that if you decide not to proceed, the charge is not refunded. At the time of writing, Kingston lists a regularisation charge of £1,042.50 for electrical installations of up to 12 circuits, and Richmond’s 2026 charges list £601.

Our guide to past electrical work with no certificate explains how to trace a missing certificate, what regularisation involves and what to do if you are selling.

The consequences of skipping notification can be serious. According to GOV.UK:

  • “The person doing the work could be prosecuted and fined if they do not comply with building regulations.”
  • The council “could make you pay to fix faulty work.”
  • “Without approval you will not have the certificates of compliance you may need when you want to sell your home.”

Approved Document P also notes that the building owner may be served with an enforcement notice if work does not comply.

Keep your paperwork

Whichever route is used, you should end up with a BS 7671 electrical installation certificate, plus either a Building Regulations compliance certificate (from a scheme-registered electrician) or a completion certificate (from building control). GOV.UK notes that a competent person scheme certificate will also show up in solicitors’ searches when you come to sell.

If you are buying a home, our guide to getting an EICR when buying a house explains how to check the condition of the electrics you are taking on. And if you are wondering whether your consumer unit is due for replacement, which is always notifiable, read when you should replace your consumer unit and our explainer on the difference between a fuse box and a consumer unit.

Questions about your electrics?

If you are unsure whether a job in your home is notifiable, your council’s building control team can tell you. For general advice about the electrics in your home, get in touch and we will point you in the right direction.

Sources

Frequently asked questions

Can I do my own electrical work at home?

Part P does not stop you doing electrical work in your own home. All of it must still be designed and installed safely and in line with BS 7671, the wiring regulations. If the job is notifiable, such as a new circuit or a replacement consumer unit, and you are not using an electrician registered with a competent person scheme, you must notify your council's building control team before you start and pay their charge.

What electrical work is notifiable under Part P?

Three types of job are notifiable: installing a new circuit, replacing a consumer unit, and any addition or alteration to existing circuits in a special location. A special location is the space around a bath or shower (up to 2.25 metres high and 0.6 metres from the edge of the bath or shower tray), or a room containing a swimming pool or sauna heater.

Is replacing a socket or light fitting notifiable?

No. Replacements, repairs and maintenance are not notifiable anywhere in the home, and neither are additions or alterations to existing circuits outside special locations. The work must still be done safely and to BS 7671, and councils can take enforcement action if non-notifiable work is found to be unsafe.

How much notice does building control need before electrical work starts?

Notifiable work must be notified before it begins. GOV.UK says you can start work 2 days after a building notice has been submitted. Kingston Council asks for building notices to be made online at least 48 hours before work starts.

How much does building control charge for electrical work in Kingston and Richmond?

At the time of writing, Kingston Council lists £695, including VAT, for a building notice covering electrical installations of up to 12 circuits done outside a competent person scheme. Richmond Council's 2026 charges, effective from 1 April 2026, list £601 including VAT for electrical wiring of up to 12 circuits where the electrician is not in a competent person scheme. Check the council's current charges before you apply.

What certificates should I get after notifiable electrical work?

You should get a BS 7671 electrical installation certificate. If the electrician is registered with a competent person scheme, you should also receive a Building Regulations compliance certificate within 30 days of the work being completed, according to Approved Document P. If building control certified the work instead, the council issues a completion certificate. Keep these safe, as you may need them when you sell your home.

Need lighting control, a smart home upgrade or an electrical fault tracked down? Tell us what you need.

Get in touch

Need help with lighting, smart upgrades or a fault?

Tell us what you have in mind and we'll come back to you with straight advice and a clear quote.

Contact us