Looped Supply and Main Fuse Upgrades Explained

Practical advice from Sparcford in Kingston

The short answer: a looped supply means your home shares one service cable from the street with one or more neighbours. Each home has its own main fuse, but the fuse in the first home on the loop limits the total current the whole loop can draw. That can matter when you add a heat pump, EV charger, electric shower or induction hob. The cut-out and main fuse belong to your network operator, so unlooping a supply or upgrading a main fuse is a job for the network operator. DESNZ notes that unlooping can sometimes also involve some electrical work inside the home. If you think you are on a loop, ask your network operator. Do not open or touch the cut-out to find out.

What a looped supply is

In January 2026 the Department for Energy Security and Net Zero (DESNZ) published research on looped supplies, carried out for it by Eunomia. It defines one like this: “A looped connection is a type of electrical setup where two or more properties share a single electricity service cable from the main network.”

It says there are “typically 2-6 properties per loop, although they can extend to more homes.” You may also see it called a looped service. Separating the homes onto their own cables is called unlooping, or delooping.

Looped supplies are common. DESNZ estimates that 11% to 17% of homes in Great Britain may have one, which is between 3.1 and 4.7 million homes. It says they are “commonly found in terraced, semi-detached, and small to medium-sized detached houses, particularly those built between the 1950s and the early 1990s.” They are more common in suburban and urban areas and can sometimes be found in flats and townhouses.

The cut-out and main fuse

The service cable ends at the cut-out. DESNZ describes it as “a piece of electrical equipment housing the main fuse, which connects the mains electricity via a service cable to the internal wiring in a property”. It is your network operator’s equipment. The Energy Networks Association’s connection form says it must not be opened unless authorised. Our guide to smart meter installs refused because of the fuse box explains who owns what in your meter cupboard.

The main fuse limits how much current your home can draw from the network. DESNZ says its rating “typically ranges from 60A to 100A”, with 60A, 80A and 100A the usual sizes.

The cut-out is not your fuse box or consumer unit. That is the board that feeds the circuits around your home. Our guide to fuse boxes vs consumer units explains how to tell old and new boards apart.

How to tell if your supply is looped

You cannot confirm it yourself. A diagram in the DESNZ report, credited to National Grid, shows two cables at the cut-out of a looped service and one cable for a single supply. If you can see two cables at your cut-out without touching anything, treat it as a hint only. DESNZ also found that network operators keep inconsistent records of which homes are looped.

The answer has to come from your network operator, so ask them. Do not open, move or touch the cut-out, main fuse or meter to check.

Why it matters for heat pumps, EV chargers, showers and hobs

These appliances draw a lot of current. DESNZ gives these figures:

  • EV chargers: up to 32A (7kW) on a single phase supply.
  • Heat pumps: “typically ranging between 16A (4kW) and 32A (8kW), depending on the property’s heating needs”. DESNZ adds that “the heat pump is almost never going to draw the full power”.
  • Electric showers: 7 to 10kW.
  • Induction hobs: a four zone hob can use 7 to 12kW in total with every zone on.

On a loop, the homes share capacity. DESNZ puts it plainly: “The fuse in the first house of a looped supply effectively sets an upper limit to the total current available to all houses on that loop.” Each home has its own main fuse, but the shared cable may not cope if several homes draw heavily at once.

Unlooping and main fuse upgrades

DESNZ calls unlooping “the primary solution”. The network operator disconnects the shared cable and lays a new one to each home, “often upgrading the cut-out to 80A or 100A fuses”. DESNZ says the new cables “will almost inevitably require groundworks (digging up and relaying of front gardens, pathways and driveways)”, sometimes at a neighbour’s home as well as yours.

A main fuse upgrade is the other option. DESNZ says: “If the first house in the loop upgrades their fuse, the rest of the loop will benefit from the increased capacity, but only if the service cable’s capacity allows.” It has limits. If a second home on the same loop later wants a heat pump or EV charger, DESNZ says the fuse upgrade “would be unlikely to support their LCT too, at which point both properties would need unlooping.” LCT means low carbon technology, such as a heat pump or EV charger. In some cases the network operator may upgrade the fuse itself when a heat pump or EV charger connection is requested, if the existing cut-out “is not of a modern or suitable specification”.

Who handles it

Your network operator. It is not the same company as your electricity supplier, the company that bills you.

DESNZ says UK Power Networks “is the DNO serving London, the South East, and the East of England”. DNO stands for distribution network operator. Do not assume which operator covers your home. Call 105, the free number for your local network operator, and check which one covers your postcode.

Who pays

DESNZ interviewed all six network operators in Great Britain and did not say which operator said what. Its finding: “All DNOs state that the customer does not pay for standard unlooping works”. Operators typically recover the cost through electricity bills instead of charging the household.

There is a caveat in the same passage: “customers may be required to pay for additional works, for example, for a three-phase upgrade being carried out in parallel, or for moving the meter entry point at the same time.” DESNZ adds that one operator was considering a charge for reinstatement work above a certain standard.

These are DESNZ’s findings across Great Britain, not any one operator’s terms. The report also says the operators did not give it cost data for main fuse upgrades. So ask your network operator, before any work starts, whether you will pay anything.

Separately, Ofgem published a decision on network connection charges on 3 May 2022. It decided to remove “the contribution to wider network reinforcement for demand connections”. For a “Domestic household installing a heat pump and electric vehicle charger”, its table of examples says: “Charge for any wider distribution network reinforcement removed altogether, with limited exceptions.” Ofgem also said connection charges would stay as they were for any “extension assets”, meaning equipment used only by you. That decision is about connection charges in general, not unlooping.

The installer’s role

If you are having a heat pump or EV charger fitted, the installer applies to the network operator, not you. DESNZ says: “To connect an LCT, installers must apply using the ENA EVCP/Heat Pump Application form.” The ENA is the Energy Networks Association. The installer is responsible for the application, including the maximum demand calculation.

Some installs can be connected first and notified afterwards, but DESNZ says that route “is not permitted if a looped service has been identified at the property in question.” Where the first home on a loop needs a fuse upgrade, “load calculations will need to be made by the installer to justify a fuse upgrade.”

On the installer’s duty to apply, the report adds in a footnote that its authors “understand that it is not always being adhered to”. Ask your installer whether they have applied to the network operator and what it said.

The electrical work inside your home is a separate matter. Fitting a heat pump, EV charger, electric shower or induction hob usually involves electrical work. It is notifiable under Part P if it includes a new circuit, a consumer unit change, or any addition or alteration to circuits in a special location, such as the area around a bath or shower. Approved Document P lists notifiable work as including “the installation of a new circuit” and “the replacement of a consumer unit”. For that work, use an electrician registered to self-certify notifiable work. Our guide to Part P explained sets out how notification works, and our guide on whether your consumer unit is outdated covers when a board may need replacing.

Planning a new kitchen?

Our kitchen electrics page explains why an induction hob needs a dedicated circuit. Questions about your main fuse or a looped supply should go to your network operator.

Sources

Frequently asked questions

What is a looped supply?

A looped supply is where two or more homes share a single service cable from the electricity network. Government research published in January 2026 says there are typically 2 to 6 homes on a loop, sometimes more. It is also called a looped service. Separating the homes onto their own cables is called unlooping, or delooping.

How do I know if my home has a looped supply?

Ask your network operator. Two cables at the cut-out can be a hint, but it is not proof, and the operators' own records are not always consistent. Do not open or touch the cut-out, main fuse or meter to check.

Who upgrades the main fuse or unloops a supply?

Your network operator. The cut-out and main fuse are its equipment, so it does this work. Call 105, the free number for your local network operator, to check which operator covers your address.

Do I have to pay for unlooping?

Government research published in January 2026, covering all of Great Britain, found that all network operators say the customer does not pay for standard unlooping. Customers may have to pay for additional work done at the same time, such as a three phase upgrade or moving the meter position. Ask your network operator before any work starts.

What does a looped supply mean for a heat pump or EV charger?

The fuse in the first home on the loop limits the total current every home on that loop can draw, so adding a heat pump or EV charger may need more capacity than the loop has. The installer must apply to the network operator, and the government research says the connect first, notify later route is not allowed where a looped service has been identified.

Need lighting control, a smart home upgrade or an electrical fault tracked down? Tell us what you need.

Get in touch

Need help with lighting, smart upgrades or a fault?

Tell us what you have in mind and we'll come back to you with straight advice and a clear quote.

Contact us